Need a vibratory hammer or drill-rig package sized to your soil log? Talk with an ABI application engineer today.

Parts & field service

Service Cadence Built for the Next 8,000 Hours of Pile Driving

From track-shoe-free vibratory clamp commissioning to eccentric-bearing rebuilds, ABI keeps your drill rigs and hammers earning on the foundation schedule—with mean-time-to-repair under 18 hours on contracted fleets.

Pre-delivery Commissioning

Hydraulic flow test, clamp-jaw torque audit, vibration-frequency baseline, and pilot-pressure log before the machine leaves Houston—or before it rolls onto your first sheet-pile line.

Scheduled Field PM

250 / 500 / 1000-hour checks covering hydraulic return filters, ISO 4406 oil sampling, eccentric grease intervals, and EPA Tier 4 Final emissions audits on diesel power packs.

Major Overhaul & Rebuild

Eccentric-weight bearing swap, hydraulic motor reseal, clamp-frame NDT, and on-site reactivation so resale value and pile penetration depth stay predictable past 8,000 hours.

Maintenance timeline your superintendent can schedule against

  1. 01

    0h Pre-delivery

    Clamp force calibration and vibration-frequency map logged against your soil package.

  2. 02

    250h First Check

    Hydraulic-return filter swap and oil sample to ISO 4406 cleanliness lab.

  3. 03

    500h Fluid Swap

    Power-pack and hammer circuit oils replaced; eccentric bearings re-greased.

  4. 04

    1000h Major PM

    Clamp-jaw wear gauge, hose bundle inspection, Tier 4 aftertreatment service.

  5. 05

    8000h Rebuild

    Eccentric rebuild, motor reseal, on-site machine reactivation with operator refresh.

< 18hMean-time-to-repair
95%First-time-fix rate
40+Certified piling FSEs
8Regional parts hubs

Schedule a fleet PM audit on your installed hammers and drill rigs.

We benchmark hydraulic cleanliness, clamp-jaw wear, and vibration-frequency drift against ABI reference contractors running similar pile penetration depth targets. Bring your ABI replacement parts list—we will mark what should stay on the trailer versus the hub shelf. Audits also log pilot pressure baselines and hydraulic system pressure (bar/psi) so the next season’s rebuild quote is tied to measured wear, not guesswork.

  • Wear survey for eccentric assemblies and clamp jaws
  • Lead-time forecast for next-season rebuild kits
  • Operator refresh on RPM windows for sheet vs H-pile

By submitting, you agree to our Privacy Policy. Application engineers typically reply within 24 hours with a lead-time window and recommended configuration.