Need a vibratory hammer or drill-rig package sized to your soil log? Talk with an ABI application engineer today.

About ABI Equipment

Two Decades of Vibratory Hammers, Drill Rigs, and Jobsite Honesty

From a 2003 Houston hydraulic shop to today’s 12,000 m² plant, ABI has stayed focused on pile-driving precision for contractors who cannot afford a silent clamp at mid-shift.

Company milestones measured in steel in the ground

  1. 2003

    Houston shop opens for vibratory clamp rebuilds

    Founders begin rebuilding excavator-mounted vibro hammers for Gulf Coast sheet-pile contractors who needed faster eccentric-bearing turnaround than offshore OEM queues.

  2. 2008

    First ABI-branded side-clamp vibratory hammer ships

    In-house hydraulic circuit and clamp-frame design enter series production with CE documentation for export to Canada and Mexico.

  3. 2012

    Rotary drill-rig line joins the plant

    Kelly-bar and CFA packages expand ABI beyond vibro driving into bored-pile and anchor work for highway retaining walls, with published rotary drilling torque curves and operating-weight classes for urban envelopes.

  4. 2016

    ISO 9001 plant certification

    Quality system covers welding NDT, hydraulic cleanliness flushing to ISO 4406 18/16/13, and serialized power-pack records.

  5. 2019

    EPA Tier 4 Final power packs standardized

    Diesel packs for urban permit windows ship with DPF / SCR aftertreatment and DEF monitoring for low-emission zones.

  6. 2024

    Application-engineering desk scales to 14 countries

    Soil-log matching and operator training become standard with every first-machine commissioning, not an optional upsell.

Engineering Honesty

Vibration-frequency maps and rotary drilling torque curves you can recalibrate on site—not marketing envelopes that ignore your CPT log.

Iron Reliability

8,000-hour rebuild paths, clamp-jaw wear gauges, and parts hubs sized for the real cost of foundation downtime.

Operator Respect

Cab visibility, clamp-engagement training, and Tier 4 noise / emissions packs so crews finish shifts without fighting the machine.

What we will not oversell

ABI builds vibratory hammers, rotary drill packages, and pad-finishing iron for foundation contractors—not a full excavator or crusher line. We disclose when vibro driving is the wrong answer (utility vibration caps, cemented refusal) and when a carrier’s hydraulic system pressure cannot feed 180–280 L/min @ 320 bar. Plant tours in Houston show the flush station and Tier 4 test cell so estimators can verify process claims before the PO, not after a refusal on site.

People who answer when the pile refuses

VP of Engineering portrait
VP Engineering
Director of Field Service portrait
Director Field Service
Applications Lead portrait
Applications Lead
Parts Hub Manager portrait
Parts Hub Manager
Operator Training Lead portrait
Operator Training Lead
Plant Quality Lead portrait
Plant Quality Lead
ISO 9001 CE 2006/42/EC EPA Tier 4 Final ANSI / ASME Hydraulic ISO 4406

Visit the Houston assembly line.

Foundation contractors are welcome by appointment—walk a clamp-frame weld bay, hydraulic flush station, and Tier 4 power-pack test cell.

Request a plant tour